November 18, 2008 - The masons have just about completed the brick work |
|
|
|
|
|
|
|
|
|
|
|
|
November 18, 2008 - All that remains for the masons is to complete the front door and window brick |
|
|
|
|
|
|
|
|
|
|
|
|
November 17, 2008 - Duct work is being installed for the heating and air conditioning system |
|
|
|
|
|
|
|
|
|
|
|
|
November 17, 2008 - Duct work is being installed for the heating and air conditioning system |
|
|
|
|
|
|
|
|
|
|
|
|
November 12, 2008 - Substantial progress has been made on the outside brick. |
|
|
|
|
|
|
|
|
|
|
|
|
November 12, 2008 - Most of the windows have been installed |
|
|
|
|
|
|
|
|
|
|
|
|
November 12, 2008 - A close up view of the coined corners and outlined window |
|
|
|
|
|
|
|
|
|
|
|
|
October 31, 2008 - Brick work is underway starting with the decorative block |
|
|
|
|
|
|
|
|
|
|
|
|
October 31, 2008 - Brick work is underway starting with the decorative block |
|
|
|
|
|
|
|
|
|
|
|
|
October 29, 2008 - The roof has been completed |
|
|
|
|
|
|
|
|
|
|
|
|
October 29, 2008 - The roof has been completed |
|
|
|
|
|
|
|
|
|
|
|
|
October 29, 2008 - The roof has been completed. Looking from the west |
|
|
|
|
|
|
|
|
|
|
|
|
October 29, 2008 - Fill has been delivered to finish the back filling to grade |
|
|
|
|
|
|
|
|
|
|
|
|
October 29, 2008 - The roof has been completed. Looking towards the front of the building |
|
|
|
|
|
|
|
|
|
|
|
|
October 23, 2008 - The roofers have started to lay the shingles |
|
|
|
|
|
|
|
|
|
|
|
|
October 23, 2008 - The roofers have started to lay the shingles. Looking from the southwest corner |
|
|
|
|
|
|
|
|
|
|
|
|
October 23, 2008 - Shingle bundles ready to be laid. |
|
|
|
|
|
|
|
|
|
|
|
|
October 23, 2008 - Workers elevate the shingles to the roof |
|
|
|
|
|
|
|
|
|
|
|
|
October 20, 2008 - Fill has started to arrive from several free sources to even out the landscape |
|
|
|
|
|
|
|
|
|
|
|
|
October 11, 2008 - Much of the roof is now complete. Shingles should be installed within the next 10 days. |
|
|
|
|
|
|
|
|
|
|
|
|
October 11, 2008 - Much of the roof is now complete. Looking from the Southwest corner. |
|
|
|
|
|
|
|
|
|
|
|
|
October 11, 2008 - The Southeast roof area of the buliding is still under construction
|
|
|
|
|
|
|
|
|
|
|
|
|
October 11, 2008 - Looking at the current progress to the front of the building.
|
|
|
|
|
|
|
|
|
|
|
|
|
October 8, 2008 - Work continues on the roof and overhangs |
|
|
|
|
|
|
|
|
|
|
|
|
October 8, 2008 - Work continues on the roof and overhangs |
|
|
|
|
|
|
|
|
|
|
|
|
October 8, 2008 - Work continues on the roof and overhangs |
|
|
|
|
|
|
|
|
|
|
|
|
October 8, 2008 - Work continues on the roof and overhangs |
|
|
|
|
|
|
|
|
|
|
|
|
October 6, 2008 - The view from inside. The large header is for the glass conference room wall |
|
|
|
|
|
|
|
|
|
|
|
|
October 6, 2008 - Looking in from the front entrance |
|
|
|
|
|
|
|
|
|
|
|
|
October 2, 2008 - Work starts on the roof |
|
|
|
|
|
|
|
|
|
|
|
|
October 2, 2008 - Work starts on the roof |
|
|
|
|
|
|
|
|
|
|
|
|
October 2, 2008 - Work starts on the roof. Looking toward the rear of the building |
|
|
|
|
|
|
|
|
|
|
|
|
September 25, 2008 - Framing for interior walls is underway |
|
|
|
|
|
|
|
|
|
|
|
|
September 25, 2008 - Framing for interior walls is underway. Looking in from the front door |
|
|
|
|
|
|
|
|
|
|
|
|
September 25, 2008 - Framing for interior walls is underway. Looking east from the west offices |
|
|
|
|
|
|
|
|
|
|
|
|
September 25, 2008 - Framing for interior walls is underway |
|
|
|
|
|
|
|
|
|
|
|
|
September 24, 2008 - Outside panels and foam board has been placed. |
|
|
|
|
|
|
|
|
|
|
|
|
September 24, 2008 - Outside panels and foam board has been placed. |
|
|
|
|
|
|
|
|
|
|
|
|
September 23, 2008 - Cement floor has been poured |
|
|
|
|
|
|
|
|
|
|
|
|
September 23, 2008 - Cement floor has been poured. Looking from the northwest towards the front doors |
|
|
|
|
|
|
|
|
|
|
|
|
September 23, 2008 - Cement floor has been poured. On the back wall of the media studio looking into the main building |
|
|
|
|
|
|
|
|
|
|
|
|
September 16, 2008 - Ready for concrete flooring to be poured. The hallway and conference room are market by the rebar |
|
|
|
|
|
|
|
|
|
|
|
|
September 16, 2008 - Ready for concrete flooring to be poured. The hallway and conference room are market by the rebar |
|
|
|
|
|
|
|
|
|
|
|
|
September 16, 2008 - Three inch PVC pipe is laid throughout the floor to allow for future wiring needs. The conference room is in the foreground. |
|
|
|
|
|
|
|
|
|
|
|
|
September 16, 2008 - Bathrooms and utility closet |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Outside framing complete. Looking at the entrance, south and east walls |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Outside framing complete. Looking at the back and west side of the building |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Outside framing complete. Looking east at the west end wall |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Looking at the media studio and storage area on the right. Kitchen area and bathrooms are along the wall to the left |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Inside of the structure looking at the north and east walls. The media studio is in the back. |
|
|
|
|
|
|
|
|
|
|
|
|
September 9, 2008 - Inside of the structure looking at the west and north walls. Each window or knock-out represents an office area |
|
|
|
|
|
|
|
|
|
|
|
|
September 5, 2008 - Construction area from the air |
|
|
|
|
|
|
|
|
|
|
|
|
September 5, 2008 - Construction area from the air |
|
|
|
|
|
|
|
|
|
|
|
|
September 5, 2008 - Construction area from the air |
|
|
|
|
|
|
|
|
|
|
|
|
August - 22 Backfilling completed and ready for framing and cement flooring |
|
|
|
|
|
|
|
|
|
|
|
|
August - 22 Backfilling completed and ready for framing and cement flooring |
|
|
|
|
|
|
|
|
|
|
|
|
August - 22 Backfilling and stone base completed with storage garadge in foreground |
|
|
|
|
|
|
|
|
|
|
|
|
August - 22 Backfilling completed looking from the front enterence |
|
|
|
|
|
|
|
|
|
|
|
|
August 14, 2008 - Poured walls with the forms still in place - Taken from the Northwest |
|
|
|
|
|
|
|
|
|
|
|
|
August 14, 2008 - Poured walls with the forms still in place - Looking from the Northwest |
|
|
|
|
|
|
|
|
|
|
|
|
August 14, 2008 - Poured walls with the storage are to the far left |
|
|
|
|
|
|
|
|
|
|
|
|
August 14, 2008 - Poured walls with the forms still in place - From the Northwest corner of the building |
|
|
|
|
|
|
|
|
|
|
|
|
August 14, 2008 - Inside of the poured walls looking to the west |
|
|
|
|
|
|
|
|
|
|
|
|
August 7, 2008 - Cement trucks standing by and ready to pour |
|
|
|
|
|
|
|
|
|
|
|
|
August 7, 2008 - Footings being filled |
|
|
|
|
|
|
|
|
|
|
|
|
August 7, 2008 - Using this boom they are able to lay cement to all of the footings |
|
|
|
|
|
|
|
|
|
|
|
|
August 7, 2008 - Looking towards the southeast at the rear of the building |
|
|
|
|
|
|
|
|
|
|
|
|
August 5, 2008 - Ready for cement footings to be poured. The storage garage is on the left side |
|
|
|
|
|
|
|
|
|
|
|
|
August 5, 2008 - Footings looking from the southwest corner |
|
|
|
|
|
|
|
|
|
|
|
|
August 5, 2008 - Footings for the main portion of the building looking from the north to the south |
|
|
|
|
|
|
|
|
|
|
|
|
August 5, 2008 - Down in the trenches |
|
|
|
|
|
|
|
|
|
|
|
|
July 30, 2008 - Looking from the west at the now vacant lot ready for construction |
|
|
|
|
|
|
|
|
|
|
|
|
July 30, 2008 - This second drive into the lot from Racine Avenue will be removed |
|
|
|
|
|
|
|
|
|
|
|
|
July 30, 2008 - The basement has been compress-filled to prevent settling |
|
|
|
|
|
|
|
|
|
|
|
|
July 30, 2008 - 1.3 acres of wide open space ready for construction of the 4,200 sq ft building |
|
|
|
|
|
|
|
|
|
|
|
|
June 19, 2008 - The building came down in less than 45 minutes |
|
|
|
|
|
|
|
|
|
|
|
|
June 19, 2008 - Several dumpsters were used to haul away the remains |
|
|
|
|
|
|
|
|
|
|
|
|
June 19, 2008 - All that stood was the old bank vault made of 1' thick cement on all sides, floor and roof |
|
|
|
|
|
|
|
|
|
|
|
|
June 19, 2008 - A wrecking ball had to be brought in |
|
|
|
|
|
|
|
|
|
|
|
|
April 9, 2008 - The origional building and lot from Hwy 36 |
|
|
|
|
|
|
|
|
|
|
|
|
April 9, 2008 - The original building |
|
|
|
|
|
|
|
|
|
|
|
|
April 9, 2008 - The original building looking from the east |
|
|
|
|
|
|
|
|
|
|
|
|
April 9, 2008 - WEMSA Office location with ACE Hardware next door |
|
|
|
|
|
|
|
|
|